All Categories

Get in touch

two 40 foot container filling equipment sent to southeast asia129-42

News

Home >  News

Two 40 foot container filling equipment sent to Southeast Asia

Oct 09, 2024

The SHEENSTAR factory has completed the production, manufacturing, and commissioning of a complete juice production line equipment. The customer was very satisfied with the operation of the equipment after coming to the factory for inspection. Immediately after receiving the final payment, we strictly followed the shipping list to prepare the equipment and provided the customer with commonly used tools and spare parts. After the container arrives at the customer's factory, our engineers will come to the site to install and debug the entire production line. After ensuring the stable operation of the entire production line, they will leave the customer's factory.

未标题-1(c11311ae78).jpg

two 40 foot container filling equipment sent to southeast asia129-52 Inquiry two 40 foot container filling equipment sent to southeast asia129-53 Email two 40 foot container filling equipment sent to southeast asia129-54 WhatsApp two 40 foot container filling equipment sent to southeast asia129-55 WeChat
two 40 foot container filling equipment sent to southeast asia129-56
two 40 foot container filling equipment sent to southeast asia129-57Top