After installation and debugging by sheenstar engineers, this purified water production line has been successfully put into production at the customer's factory in Tanzania. The output of this production line is 8000 bottles per hour. We provide a water treatment system based on the quality of the customer's source water, and configure a bottle blowing machine system, filling machine, labeling machine, and film packaging machine according to the customer's production requirements. The entire production line runs stably and can fully meet the customer's production requirements. Sheenstar engineers not only installed and test run the purified water production line at the customer site, but also trained the users on the correct operation and maintenance of the equipment. This can not only improve future production efficiency, but also enable the production line to operate stably for a long time. Welcome to inquire about sheenstar's water filling production line