Recently, many equipment at the Sheenstar factory have completed production, manufacturing, and testing. After customer inspections, we pack the equipment using wooden crates or pallets. This water producing line capacity can be 20000bph, fully automatic running. Once an order is placed, our sales, technical, warehouse, and quality inspection departments hold meetings to discuss the customer's specific requirements and strictly adhere to them during production. After the equipment is completed, we carefully check each item against the equipment list before packing. This ensures that all equipment and spare parts are delivered to the customer's factory in one shipment, reducing the time and cost of additional shipments later.
2025-04-07
2025-03-26
2025-03-19
2025-03-12
2025-03-05
2025-02-26