We packed the complete water production line in wooden boxes and shipped it to the customer's factory on time within the delivery deadline. After preparing the infrastructure such as water, electricity, and gas at the customer's factory. SHEENSTAR 's engineers went to the client's country, arranged and installed the relevant equipment according to the layout plan, combined with the on-site situation, and conducted debugging and operation. They provided professional training to the relevant operators to enable them to correctly use and maintain the equipment, so that the water production plant can keep stable running. A few days after the production line is put into operation, after making sure the drinking water filling packing line can daily produce bottled water, the engineers will go to other customer factory.